None
Recent failures
| Failed In | Fixed In | Time Taken To Fix | ||
|---|---|---|---|---|
| #8 |
Code changes detected
|
Currently failing | ||
- Average time to fix a failure: 4 weeks, 4 days, 15 hours, 33 minutes
- Average number of builds between fixes: 1 builds
- The longest time taken to fix a failure is 4 weeks, 4 days, 15 hours, 33 minutes, from failure starting in build #8.
- The greatest number of builds taken to fix a failure is 1, from failure starting in build #8.